CONSTRUCTION OF ROADS, DRAINS AND CULVERTS AT PARAFAITE HARMONIE
![PARAFAITE HARMONIE](https://static.wixstatic.com/media/b956ad_0900db63c05e4ef89b4f09d86592a848~mv2.png/v1/fill/w_750,h_424,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Image-empty-state.png)
The works for this project comprises of the following: construction of 32 roads approximately 5.8 miles of SBST/DBST with design carriageways widths of 4.9m (main roads) and 3.7m (secondary roads) and both side drains. The works also include clearing of canals, construction of HDPE roadside drainage culverts and the construction of reinforced concrete bridges.